​​
Aluminum Skid Plate
Front Skid Plate 4Runner
Front Skid Plate 4Runner
Toyota 4Runner 2010-2022
CBI Skid Plates
Off-Road Skid Plates
Aluminum Skid Plate
Front Skid Plate 4Runner
Front Skid Plate 4Runner
Toyota 4Runner 2010-2022
CBI Skid Plates
Off-Road Skid Plates

CBI

CBI - Toyota 4Runner Front Skid Plate | 2010-2022


$640.00 Sale Save

Protect your 5th Gen Toyota 4Runner (2010–2022) with CBI Offroad Toyota 4Runner Front Skid Plate. Built from steel or aluminum, they offer maximum undercarriage protection with easy bolt-on installation and integrated drain ports for hassle-free maintenance.

Features

  • Available in steel or aluminum for strength and durability
  • Protects crucial undercarriage components from damage
  • Direct bolt-on installation, no cutting or drilling required
  • Integrated drain ports for easy cleaning and maintenance
  • Widest coverage of any skid plate on the market

Upgrade your 4Runner with CBI skid plates and tackle any trail with confidence and complete undercarriage protection.

WEIGHT 85 lbs
DIMENSIONS 48 × 40 × 15 in
POWDER COAT

Bare Metal, Powder Coat Black, TRD Grey

MATERIAL

Aluminum, Steel

MAKE

Toyota

MODEL

4Runner

BRAND

CBI

YEAR

2010, 2011, 2012, 2013, 2014, 2015, 2016, 2017, 2018, 2019, 2020, 2021, 2022

Below are the current estimated lead times CBI & Prinsu products.  Please contact us if you have any questions. 🤙

  1. Prinsu Roof Racks - 1 Week
  2. Accessories (brackets, mounts, etc.) - 1-2 Weeks
  3. Skid Plates - 4-6 Weeks
  4. Bed Racks - 4-6 Weeks
  5. Bed Bars - 1-2 Weeks
  6. DOM Rock Sliders - 6+ Weeks
  7. Rock Sliders - 6+ Weeks
  8. Steel Front Bumpers - 8-10 Weeks
  9. Aluminum Front Bumpers - 4-6 Weeks
  10. Rear Bumpers - 10-12 Weeks
  11. Covert Bumpers - 5+ Weeks

We do our very best to get the product out in a timely manner. The estimated date provided on your order is just that, an estimate. It is not a guarantee that the product will be shipped on that date. The estimated date is given to provide some sense of how long the build process will take. 

In the best cases, the lead time can be shorter however, in other cases lead times can be longer depending on the product and the number of products we build per run.  Feel free to check on your order at any time.